Image from Google Jackets

Aspects of project planning,monitoring,evaluation and implementation by Kunwar D. Singh and Nyandemo S.M

By: Contributor(s): Material type: TextTextPublication details: India : Bishen singh mahendra pal singh , c2004.Description: 110 p . : illISBN:
  • 9788121103961
  • 8121103967
Subject(s): LOC classification:
  • HD69.P75 .S56 2004
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode Item holds
Short Loan for 1 day Short Loan for 1 day UOE Main Library Short Loan Area HD69.P75 .S56 2004 (Browse shelf(Opens below)) 20157151 Available 20157151
Short Loan for 1 day Short Loan for 1 day UOE Main Library Short Loan Area HD69.P75 .S56 2004 (Browse shelf(Opens below)) 20157152 Available 20157152
Loan - Normal on open shelf Loan - Normal on open shelf UOE Main Library Open shelf HD69.P75 .S56 2004 (Browse shelf(Opens below)) 20157153 Available 20157153
Loan - Normal on open shelf Loan - Normal on open shelf UOE Town Campus Open shelf HD69.P75 .S56 2004 (Browse shelf(Opens below)) 20157150 Available 20157150
Loan - Normal on open shelf Loan - Normal on open shelf UOE Town Campus Open shelf HD69.P75 .S56 2004 (Browse shelf(Opens below)) 20157149 Available 20157149
Total holds: 0

There are no comments on this title.

to post a comment.